FULFILLED
PROJECTS
PROJECTS IN
MEXICO
2001 | CCC Transalta – Campeche Main Substation |
2001 | Testing and Commissioning of Areva 115 KV GIS |
2002 | Testing and Commissioning of Areva 400 KV GIS |
2003 | Testing and Commissioning of El Sabino 400 KV Substation |
2004 | Testing and Commissioning of Salamanca Substation, León III Substation, Potrerillos Substation, San Juan del Río Substation, La Higuera Substation. |
2005 | Testing and Commissioning of CCC Altamira V 1121 MW |
2006 | Testing and Commissioning of CCC Tamazunchale 1135 MW |
2007 | Testing and Commissioning of Hyundai 400 KV GIS |
2018 | Testing and Commissioning of CCC Tierra Mojada |
2021 | Testing and Commissioning of Pichilingue Booster Substation |
PROJECTS IN
QATAR
2009 | Testing and Commissioning of Areva 400 KV GIS. |
2009 | Testing and Commissioning of Areva 220 KV GIS. |
2010 | Testing and Commissioning of Areva 132 KV GIS. |
2010 | Testing and Commissioning of CCC Messaied 2000 MW |
PROJECTS IN
Spain
2011 | Engineering Coordination and Supervision |
PROJECTS IN
South Korea
2012 | Engineering Coordination and FAT Testing |
PROJECTS IN
Saudi Arabia
2011 | Testing and Commissioning of Manifa GIS Hyundai 115 KV CCC |
2013 | Testing and Commissioning of Manifa 516 MW CCC |
2014 | Testing and Commissioning of Sabic Jubail Refinery. |
PROJECTS IN
PERU
2015 | Engineering, Testing, and Commissioning of CCC ENERSUR |
PROJECTS IN
DOMINICAN REPUBLIC
2017 | Consultancy Engineering, Testing, and Commissioning of CCC Los Minas – AES |
PROJECTS IN
FINLAND
2018 | Consultancy Engineering, Testing, and Commissioning of Kilpilahti Power Plant CCC |
PROJECTS IN
UNITED KINGDOM
2020 | Testing and Commissioning of TEESIDE |
PROJECTS IN
UNITED ARAB EMIRATES
2019 | Consultancy Engineering, Testing, and Commissioning of Hamriyah IPP 1800 MW CCC |
2022 | EPC for the Bu Hasa Integrated Field Development Project |